Cleroux Crescent

Cleroux Crescent

2380 and 2396 Cleroux Crescent The intent is to develop the lands to allow for 2 rental apartment buildings that will be 3 storeys in height and each building will have 40 rental units. There will be 80 units in total and 101 parking spaces

Blair Road Study

Blair Road Transit Priority Plan

The City of Ottawa has completed the Blair Road Transit Priority (Blair LRT Station to Innes Road) Environmental Assessment (EA) Study and has developed a Recommended Plan to widen Blair Road for shared bus and high occupancy vehicle lanes. Pedestrian and cycling facilities have also

NCC Capital Pathway Plan

NCC Greenbelt Pathway East

This route will form the periphery of the southeast quadrant of the pathway network, between the Ottawa River Pathway at Green’s Creek and the Southern Corridor Pathway at Black Rapids Lock. The pathway connects to Greenbelt trails and destinations, and passes through or near a

2441 Cleroux

2441 Cleroux

The Owner wants to demolish the existing one-storey dwelling in order to construct a three-storey, 6-unit apartment building, as shown on plans filed with the Committee. In order to proceed, the Owner requires the Authority of the Committee for Minor Variances from the Zoning By-law

2487 Innes

2487 Innes Road

Applicant’s Proposal A Site Plan Control application to construct a 33 unit low rise apartment building with 45 vehicle parking spots and 15 bicycle parking spaces at 2487 Innes Road. Proposal Details The site has frontage along Innes Road in the community of Blackburn Hamlet.

Montreal Station Concept

Montreal Road O-Train Station

As part of the installation of the new O-Train station at Montreal Road, a new 2.7-kilometer multi-use pathway will be built between Blair Station and Montreal Station, along the north side Highway 174. This will continue east from Montreal Road station to the Sir George

Skip to content